On-Site Power

Reliable Power for
Data Centers

The grid can't keep up. Dominus Capital Group provides on-site power generation solutions — including access to GE aeroderivative and industrial gas turbines — for data center campuses where grid constraints are killing timelines.

252 GW
National DC Pipeline
~1/3
Needs On-Site Power
3–5+ Yr
Grid Interconnect Delays
2030
OEM Backlogs Extend To
The Grid Problem

Grid Constraints Are the #1 Bottleneck in Data Center Development

Utility interconnection timelines of 3–5+ years are killing project schedules across every major data center market. Hyperscalers, colo operators, and enterprise tenants need power now — not in 2029.

The U.S. has 252 GW of new data center capacity in the development pipeline. Roughly one-third of it requires on-site or off-grid power solutions because the grid simply cannot deliver on the timeline operators need.

Texas alone has seen explosive growth — nearly half of the state's 80.6 GW in planned gas capacity is dedicated to data center power. The opportunity is massive and time-sensitive.

Why On-Site Power

Grid interconnection queues of 3–7 years in constrained markets
Utility capacity shortfalls in primary DC corridors
Hyperscaler demand outpacing grid buildout by 5–10x
Regulatory delays on new transmission infrastructure
Tenant SLA requirements that grid reliability cannot guarantee
Carbon and sustainability mandates driving distributed generation
Economic advantage: on-site power can beat grid rates in peak markets

Our Solutions

Gas Turbine Access & Power Solutions

Dominus Capital Group has access to aeroderivative and industrial gas turbines — including units that are backordered through 2030 at most OEMs. We source, finance, and deploy power solutions at the asset level.

GE Aeroderivative

TM2500

Output ~35 MW
Type Mobile Aeroderivative
Fuel Natural Gas / Dual Fuel
Deploy Time Rapid — Trailer-Mounted

The fastest path to power. Trailer-mounted, rapid-deploy gas turbine ideal for bridge power, emergency capacity, and fast-track data center projects. Plugs in and generates — no permanent foundation required.

GE Aeroderivative

LM2500

Output ~33 MW
Type Aeroderivative
Fuel Natural Gas / Dual Fuel
Efficiency High — CHP Capable

The workhorse of aeroderivative power generation. Proven across thousands of installations worldwide. Fast start-up, high reliability, and scalable for multi-unit campus configurations.

GE Aeroderivative

LM6000

Output ~50 MW
Type Heavy Aeroderivative
Fuel Natural Gas / Dual Fuel
Best For Large Campus Baseload

Maximum output in the aeroderivative class. Ideal for large-scale data center campuses requiring 50+ MW of dedicated on-site baseload power. Proven in critical infrastructure applications globally.

Additional Power Solutions

Industrial gas turbines (Frame 5, Frame 6, Frame 7)
Reciprocating engine gensets (for smaller loads)
Combined heat & power (CHP) configurations
Hybrid solutions: turbine + battery storage
Temporary / mobile power for construction phases
Long-term power purchase agreements (PPAs)
Fuel supply and gas interconnection planning
Emissions permitting and environmental compliance
O&M partnerships for ongoing turbine operations

Who We Work With

From Developers to Hyperscalers

Data center developers seeking on-site generation for new campuses
Colocation operators expanding beyond available grid capacity
Hyperscale tenants with multi-hundred MW power SLA requirements
Gas turbine OEMs and equipment suppliers seeking deployment partners
Energy developers and IPPs targeting data center offtake
EPC contractors building data center power infrastructure
Utilities and co-ops in grid-constrained markets
Private equity sponsors backing DC platform builds

Key Markets for On-Site Power

Texas

~40 GW of planned DC-dedicated gas capacity. Grid stress + explosive demand = massive on-site power opportunity.

Northern Virginia

The world's largest DC market. Dominion Energy interconnect queues are years long. On-site power is increasingly the only path forward.

Phoenix / Maricopa

Rapid DC buildout straining APS and SRP capacity. New campuses are planning generation from day one.

Southeast (GA, TN, NC)

Emerging DC corridor with grid constraints already surfacing. Early movers on on-site power will have a significant advantage.

Market Context

The OEM Landscape

Major gas turbine manufacturers — Baker Hughes, GE Vernova, Siemens Energy, and Mitsubishi Power — have backlogs extending through 2030. New turbine orders placed today may not deliver for 3–4 years.

Dominus has cultivated relationships across the turbine supply chain — OEMs, distributors, secondary market dealers, and refurbishment shops — to source units that others can't access.

Our advantage: We have access to TM2500s, LM2500s, LM6000s, and many other turbine solutions — including units available for near-term deployment when OEM lead times won't work. If you need power and can't wait 3 years, talk to us.

Need power for your data center?

Whether you're planning a new campus or hitting grid constraints on an existing facility — we have solutions available now.